Systems in Washington, DC are allowed to have energy production estimated by GATS, the SREC-awarding entity, if the system size is 10kW DC or smaller and does not have a revenue-grade meter.
Systems in Washington, DC are allowed to have energy production estimated by GATS, the SREC-awarding entity, if the system size is 10kW DC or smaller and does not have a revenue-grade meter.